Multi Academy Trust Schools (MATS): Repair and Maintenance
Ashley Consultants has a wide range of experience in the Public Sector, from new build construction to extending, repairing and refurbishing existing buildings or roofs. We only use highly skilled, selected trades persons to ensure all works are completed successfully.
examples of previous projects
- OBTAINING FUNDING FOR MATS THROUGH THE PUBLIC SECTOR DECARBONISATION SCHEME (PSDS)
Projects include the repair and maintenance of any element of the structure and/or the improvement or refurbishment of an area.
What we can supply:
Ashley Consultants work very closely with Governing Bodies and Premises Staff, helping ensure every opportunity for successfully developing and improving their Premises.
What we can supply:
- Condition Surveys (giving a Report, Priority, Costing and Photographic Evidence)
- Preparation of Specifications
- Preparation of Drawings
- Tendering of Projects
- Application for Planning Permission and Building Control Approval
- CDM (Health and Safety) Compliance
- Commissioning and Project Management and Monitoring - including Financial Management and Deliverance
Ashley Consultants work very closely with Governing Bodies and Premises Staff, helping ensure every opportunity for successfully developing and improving their Premises.
- school roof replacement
roofing after completion
This project was to part replace the existing roof covering with a high performance flat roofing system, while upgrading the roof insulation to save heating energy in the winter and reduce solar gain in the summer.
This included preparing a specification and tendering prior to the School’s Summer Holidays, with completion before the return of Pupils in September.
All complying with Health and Safety requirements.
This included preparing a specification and tendering prior to the School’s Summer Holidays, with completion before the return of Pupils in September.
All complying with Health and Safety requirements.
- school toilet refurbishment
This project included the removal of the male and female toilets with total refurbishment of these areas, during summer holidays.
Again these works had a limited window of time to complete with 1000+ Students returning in September.
The project included the total demolition and redesign of both male and female toilets, including new water resistant suspended ceilings, full wall and floor tiling, heavy duty sanitaryware, toilet cubicles and the upgrading of all services.
The flow of students through the toilet block and ease of cleaning were vital design considerations. With high usage during a short period of time, 3 breaks a day, pupils have got to be able to move quickly through the facility!!
Again these works had a limited window of time to complete with 1000+ Students returning in September.
The project included the total demolition and redesign of both male and female toilets, including new water resistant suspended ceilings, full wall and floor tiling, heavy duty sanitaryware, toilet cubicles and the upgrading of all services.
The flow of students through the toilet block and ease of cleaning were vital design considerations. With high usage during a short period of time, 3 breaks a day, pupils have got to be able to move quickly through the facility!!